West Point Spillway Gate Painting
DEPT OF DEFENSE
Free. Verify your email, then we send one reminder only.
- Posted
- Feb 27, 2026
- Closes
- Rolling, no fixed deadline
Similar opportunities open now
- Control Tower Chamber Equipment Painting, Colebrook River Lake, Colebrook, CTSame funderOpenDEPT OF DEFENSENo deadline listed
- Levee Repair at MRLS L246Same funderOpenDEPT OF DEFENSENo deadline listed
- Missouri Valley Levee RepairsSame funderOpenDEPT OF DEFENSENo deadline listed
- Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4Same funderOpenDEPT OF DEFENSENo deadline listed
- 99--Hoover Dam Interpretive Design for Observation Level, Theaters, and Outdoor AreOpenINTERIOR, DEPARTMENT OF THENo deadline listed
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the other heavy and civil engineering construction category. Applications are accepted on a rolling basis. This solicitation carries a Total Small Business Set-Aside (FAR 19.5) set-aside.
Classification and identifiers
- Industry (NAICS)
- Other Heavy and Civil Engineering Construction (237990)
- Product or service (PSC)
- Repair or Alteration of Dams (Z2KA)
- Solicitation number
- W9127825RA078
- Contracting office
- W074 ENDIST MOBILE
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
THIS IS A TOTAL SMALL BUSINESS SETASIDE. THIS PROJECT IS A STAND-ALONE ?C? TYPE, REQUEST FOR PROPOSAL (RFP), BEST VALUE SOURCE SELECTION SOLICITATION. Construction Order of Magnitude: Between $10,000,000 - $25,000,000 This project requires the Contractor to provide all labor, materials and equipment necessary to prep, prime and paint all metal components of the spillway gates, hoists and associated equipment. Painting includes blasting and painting of each structure, minor structural girder modifications, installing/replacing rubber seals and cathodic protection anodes on each gate, and performing weld repairs in accordance with the specifications. In addition, the contractor will be required to remove and replace the ?new? set of stoplogs seal assemblies prior to the gate painting effort....