Skip to content
OpenDue June 24, 2026

Munising Falls Trail Rehabilitation

INTERIOR, DEPARTMENT OF THE

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

SOLICITATION NOTICE: The National Park Service, Interior Regions 3/4/5, Ohio Major Acquisition Buying Office, is issuing an Invitation for Bids (IFB) for the Munising Falls Trail Replacement project for the Pictured Rocks National Lakeshore in Munising, Michigan. Providing all labor, materials, tools and other equipment necessary for renovating an approximately 650 foot long paved trail. The existing trail is asphalt pavement with three wood bridges. The trail traverses a variety of steep and gradual terrain and follows Munising creek terminating at an overlook deck at the base of Munising Falls. The existing trail is approximately 5 ft wide typical and the proposed trail is 6� wide typical. Existing bridges and portions of the existing on-grade trail will be replaced with elevated boardwa...

Finding similar opportunities...