Chiller Replacement Roybal Campus
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
About this archived opportunity
This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. a. Provide all design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services required to modernize the B10 chilled-water plant. b. Replace four existing 1,450-ton chillers with new 1,800-ton chillers and provide associated starters, controls, piping, isolation valves, refrigerant monitoring, and appurtenances. c. Replace nine existing cooling tower cells with eight new cells; provide structural modifications, walkways, maintenance access, valves, piping, and roofing work required for the new configuration. d. Replace primary chilled-water pumps, condenser-water pumps, associated starters / VFDs, and modify chilled-water and condenser-water piping as required for the new plant arrangement. e. Perform associated medium-voltage and low-voltage electrical upgrades, BAS / controls integration, structural work, fire protection modifications, and ancillary systems work identified in Attachment A. f. Provide phased execution that preserves campus operations; no more than two chillers may be removed from service at one time.
Historical details
- Status
- Closed
- Deadline
- June 15, 2026
- First captured
- April 24, 2026
- Publisher reference
- bd2ccd6fc777401793d2ce267fcb54ae
Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA
This opportunity has closed
Chiller Replacement Roybal Campus
by HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new chiller, replacement, roybal opportunities are posted. Free.
Related opportunities
- Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101VETERANS AFFAIRS, DEPARTMENT OFCloses in 26 days
- Replacement of Chillers and Pumps - FCC Oakdale, LAJUSTICE, DEPARTMENT OFCloses in 68 days
- 2027-180000-0707-001113-Group 6-2 HVAC ReplacementHenry County Board Of EducationCloses in 14 days
- [2000-27] RFQP-CM_0269-2023 Chilled Water Distribution Replacement Klaus to CoCGeorgia Institute Of TechnologyCloses in 6 days
- REPLACE B3408 CHILLER, JBPHH-HIDEPT OF DEFENSECloses today