Safety Shower and Eyewash Corrections Phase 1
COMMERCE, DEPARTMENT OF
This opportunity closed June 23, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- Safety Shower and Eyewash Corrections Phase 1OpenCOMMERCE, DEPARTMENT OFCloses in 4 days
- B2A Demolition, NIST, Boulder, COOpenCOMMERCE, DEPARTMENT OFCloses in 12 days
- NIST Boulder Building 4 Room 1318 Fire Suppression UpdatesOpenCOMMERCE, DEPARTMENT OFCloses in 14 days
- Site Effluent SystemOpenCOMMERCE, DEPARTMENT OFCloses in 4 days
- B730 - Renovate RM106 for Emergency Operations CenterOpenDEPT OF DEFENSECloses in 32 days
About this archived opportunity
REFER TO ATTACHMENTS FOR DETAILED INFORMATION REGARDING SOLICITATION: 1. 1333ND26RNB190015 Eyewash Phase 1 NIST Boulder CO.pdf, and 2. OFPM Site Standards.zip Background Information The Department of Commerce (DOC) campus is a research and development complex located at 325 Broadway in Boulder, Colorado. The National Institute of Standards and Technology (NIST) is the primary occupant, National Oceanic Atmospheric Administration (NOAA) and National Telecommunications and Information Administration (NTIA) also have a presence on campus. NIST�s Office of Facilities and Property Management (OFPM) is responsible for maintaining and renovation of spaces which consist of laboratories, office space and facilities maintenance areas throughout the campus. Annual testing of safety showers and eyewashes across campus have shown a significant number of fixtures failing to meet the ANSI Z358.1-2014 (Emergency Eyewash & Shower Standard), mostly shower/eyewash combination fixtures that fail during simultaneous operation. OFPM conducted a study which identified deficient fixtures, determined the cause of failure, and recommended necessary actions to bring the fixtures into compliance. Purpose Many of the deficiencies identified have been remedied by NIST OFPM employees completing the recommended corrective actions. However, the scope in some buildings/areas is large enough to warrant contracted construction: Building 22 (B22), Building 25 (B25), Building 42 (B42/Central Utility Plant � CUP), Building 1 (B1), and Building 2 (B2) all have emergency fixtures needing attention. The intent of this project is to remedy the remaining deficiencies such that all emergency fixtures are compliant with ANSI Z358.1-2014. This Design-Build project is structured with B22 as the base scope and four option CLINs for the other abovementioned areas. Recommendations presented in this SOW and supporting documents are intended to be an optional starting point. Additional design and coordination will be necessary to proceed with any of the recommendations. It is the responsibility of the contractor to evaluate and confirm the viability of the recommendations, provide an engineered design, and execute the construction to successfully bring all fixtures within project scope into compliance. PLACE OF PERFORMANCE: NIST Boulder Campus, Boulder, CO
Historical details
- Status
- Closed
- Deadline
- June 23, 2026
- First captured
- May 2, 2026
- Publisher reference
- b471f22df7bb4f719a2431c53ba093bf
Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA
This opportunity has closed
Safety Shower and Eyewash Corrections Phase 1
by COMMERCE, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new safety, shower, eyewash opportunities are posted. Free.
Related opportunities
- Safety Shower and Eyewash Corrections Phase 1COMMERCE, DEPARTMENT OFCloses in 4 days
- B2A Demolition, NIST, Boulder, COCOMMERCE, DEPARTMENT OFCloses in 12 days
- NIST Boulder Building 4 Room 1318 Fire Suppression UpdatesCOMMERCE, DEPARTMENT OFCloses in 14 days
- Site Effluent SystemCOMMERCE, DEPARTMENT OFCloses in 4 days
- B730 - Renovate RM106 for Emergency Operations CenterDEPT OF DEFENSECloses in 32 days
- B836 Replace Electrical in Airfield Lighting VaultDEPT OF DEFENSECloses in 39 days