Solicitation Notification For: Cedar Rapids Flood Risk Management Project, Reach 1, Cedar Lake South Railyard (Hoth)Floodwall
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
ATTENTION Due to file sizes and SAM.gov limitatins at the time of release, not all of the files that are needed are posted. The file: 1. Attachment J-2 Plan Set - VOL117 Railyard_Floodwall. Please email Jake Anderson and Ryan Larrison at the following emails and you will get a link to the file via DoD SAFE: jake.t.anderson@usace.army.mil ryan.r.larrison@usace.army.mil The U.S. Army Corps of Engineers, Rock Island District has a requirement for a construction contract for the project known as: CEDAR RAPIDS FLOOD RISK MANAGEMENT PROJECT, REACH 1, SOUTH RAILYARD FLOODWALL. The work includes, but is not limited to: Demolition; temporary traffic control; clearing and grubbing; metal sheet pile and steel H-pile installation; toe drain installation; floodwall construction; watermain modifications...