Skip to content
ClosedNo longer accepting applications

Y--Cottonwood Substation Construction, Stage 02, Phase 01

ENERGY, DEPARTMENT OF

About this archived opportunity

Cottonwood Substation Construction, Stage 02, Phase 01 Western Area Power Administration, Sierra Nevada Region has a requirement for a contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of Cottonwood Substation, Stage 02, Phase 01 located in Shasta County, CA. The principal components of work include one (1) pre-fabricated control building foundation, site development for yard access, removal of existing wall to accommodate one (1) automatic 20-foot rolling gate, gate accessibility equipment including one (1) environmental enclosure and associated control cables, two (2) keypads and one (1) gate motor operator, station service arrangement and associated foundations including one (1) AC distribution panel, one (1) automatic transfer switch and two (2) fusible safety disconnect switches, two (2) precast pull boxes, and concrete encased duct banks. The estimated construction magnitude of this project is between $500,000 and $1,000,000. All work is to be completed within 180 days from receipt of Notice to Proceed. The solicitation will be issued as a 100% Small Business Set-aside. The applicable NAICS Code is 237130 with an SBA Size Standard of $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 29 May 2026 to the following sites: https://www.fedconnect.net and https://www.sam.gov. This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Emailed bids WILL NOT be accepted. Note: The Buy American Act applies to the solicitation. Refer to RFO FAR Clause 52.225-9 and RFO FAR Provision 52.225-10 if any non-domestic material is proposed. Bidders must identify any non-domestic materials included in their bid. Please verify with suppliers and subcontractors whether their quotes will include non-domestic material.

Historical details

Status
Closed
Deadline
June 29, 2026
First captured
May 13, 2026
Publisher reference
ea605c0eb13642b78ad12f10583f9cbd

Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA

This opportunity has closed

Y--Cottonwood Substation Construction, Stage 02, Phase 01

by ENERGY, DEPARTMENT OF

Get notified when similar opportunities open

We'll save this search and email you when new cottonwood, substation, construction opportunities are posted. Free.

Refine this search