NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
AGRICULTURE, DEPARTMENT OF
About this archived opportunity
Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
Historical details
- Status
- Closed
- Deadline
- June 19, 2026
- First captured
- May 20, 2026
- Publisher reference
- 765d4d1f291247d3be06016751e4b1d1
Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA
This opportunity has closed
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
by AGRICULTURE, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new tyler, rehabilitation, project opportunities are posted. Free.