RENO BOTTOMS HREP - STAGE 2 - ICE HAUL SLOUGH
DEPT OF DEFENSE
Free. Verify your email, then we send one reminder only.
- Posted
- May 22, 2026
- Closes
- Rolling, no fixed deadline
Similar opportunities open now
- Crains Island Stage 3Same funderOpenDEPT OF DEFENSENo deadline listed
- Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment ProjectSame funderOpenDEPT OF DEFENSENo deadline listed
- Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277Same funderOpenDEPT OF DEFENSECloses Apr 2028
- Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276Same funderOpenDEPT OF DEFENSECloses Apr 2028
- Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275Same funderOpenDEPT OF DEFENSECloses Apr 2028
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the other heavy and civil engineering construction category. Applications are accepted on a rolling basis. This solicitation carries a Total Small Business Set-Aside (FAR 19.5) set-aside.
Classification and identifiers
- Industry (NAICS)
- Other Heavy and Civil Engineering Construction (237990)
- Product or service (PSC)
- Construction of Other Non-Building Facilities (Y1PZ)
- Solicitation number
- W912ES26BA013
- Contracting office
- W07V ENDIST ST PAUL
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
RENO BOTTOMS HREP, STAGE 2, ICE HAUL SLOUGHThis contract is for the construction of island enhancement features and Ice Haul closure structure in the backwater area of Pool 9 of Reno Bottoms of the Mississippi River. The projects purpose is the restoration and protection of diverse bottomland forest habitat. Structures must be constructed with fine fill materials from habitat dredging and granular material from offsite stockpiles. Provide riprap and place it along the shore to protect the island in selected areas.