Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades (New Single Story PEMB/Demo Old Building)
TRANSPORTATION, DEPARTMENT OF
About this archived opportunity
*********************THIS IS A MARKET SURVEY ONLY******************** - This is not a Screening Information Request or Request for Proposals of any kind; - The FAA is not seeking or accepting unsolicited proposals; - The FAA will not pay for any information received or costs incurred in preparing the response to the market survey; and - Any costs associated with the market survey submittal are solely at the interested vendor�s expense. ****************************************************************************** 1. This market survey is for Industrial Wastewater Treatment Plant (IWTP) which include demo existing building and construct a new Pre-Engineered Metal Building (PEMB) as identified below. b. Disclosure of the Size of Construction Projects: This potential project is estimated to be between $10,000,000 and $20,000,000 a. Provide all labor, equipment, and materials to demolish existing Industrial Wastewater Treatment Plant (IWTP) and associated equipment. Replace with a new building located north of the existing plant as well as new lift stations and forcemain piping. The project includes: A new single story, Pre-Engineered Metal Building (PEMB) approximately 4,900 Gross Square Feet. Primary space is an industrial waste treatment processing area, with accessory office/work areas, equalization tank/area, storm shelter restroom, and utility support spaces. The existing IWTP plant (eIWTP) will be decommissioned and demolished once the new IWTP (nIWTP) plant has been built and flow has been diverted to the nIWTP for processing. Lift Stations #1, 3, and 4 will be replaced with new double-walled fiberglass wet wells to ensure full secondary containment. Lift stations #2 and #5 will be demolished and filled in with select fill and covered with sod. The existing concrete containment trench that houses the industrial waste force mains from the lift stations to the eIWTP will be demolished in full and removed. New 4-inch inner diameter by 6-inch outer diameter double-walled CPVC piping will be installed via direct bury, along the path of the removed trench. 2. Market Survey Response should include the following: a. Capability Statement - This document should identify: - Type of services provided by firm, - Size and type of services provided on previous government/private sector contracts - Number of years in business - Small Business Size Status to include applicable small business socio-economic status - Current SAM.gov Registration status and SAM.gov UEI b. Brief information (Agency or Customer/Dollar Amount/Scope/etc) regarding past projects respondent has completed with similar magnitude and work that is identified in this Market Survey All responses to this market survey must be received by June 22, 2026, 3:00 p.m. CT. All capability statements must be submitted by email to: andre.casiano@faa.gov
Historical details
- Status
- Closed
- Deadline
- June 22, 2026
- First captured
- June 2, 2026
- Publisher reference
- cfcba675b3704e079548c33cdadbf656
This opportunity has closed
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades (New Single Story PEMB/Demo Old Building)
by TRANSPORTATION, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new mike, monroney, aeronautical opportunities are posted. Free.
Related opportunities
- Integrated Solid Waste Management Services (ISWM) at NAS Meridian, MSDEPT OF DEFENSE
- Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA.DEPT OF DEFENSE
- WPAFB 3rd Air Stream/ B18DEPT OF DEFENSECloses Oct 2026
- Domestic Water Treatment Plant Repair at the New MINTERIOR, DEPARTMENT OF THECloses in 3 days