Skip to content
ClosedNo longer accepting applications

Upgrade UPS & Cooling System

DEPT OF DEFENSE

About this archived opportunity

The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. � 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. � 5.3.4 Demo existing piping � 5.3.5 Run new Pex piping to the in-row coolers. � 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. � 5.3.7 Existing 3� Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. � 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. � 5.3.9 Install Power Modules and Battery Cabinets � 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT

Historical details

Status
Closed
Deadline
June 30, 2026
First captured
June 2, 2026
Publisher reference
19c2cdaeea8d4412b55ebdc452e10d69

Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA

This opportunity has closed

Upgrade UPS & Cooling System

by DEPT OF DEFENSE

Get notified when similar opportunities open

We'll save this search and email you when new upgrade, cooling, system opportunities are posted. Free.

Refine this search