Upgrade UPS & Cooling System
DEPT OF DEFENSE
About this archived opportunity
The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. � 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. � 5.3.4 Demo existing piping � 5.3.5 Run new Pex piping to the in-row coolers. � 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. � 5.3.7 Existing 3� Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. � 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. � 5.3.9 Install Power Modules and Battery Cabinets � 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT
Historical details
- Status
- Closed
- Deadline
- June 30, 2026
- First captured
- June 2, 2026
- Publisher reference
- 19c2cdaeea8d4412b55ebdc452e10d69
Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA
This opportunity has closed
Upgrade UPS & Cooling System
by DEPT OF DEFENSE
Get notified when similar opportunities open
We'll save this search and email you when new upgrade, cooling, system opportunities are posted. Free.