Skip to content
OpenDue July 6, 2026

DOT HQ Moveable Bollards

GENERAL SERVICES ADMINISTRATION

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

Provide construction services for design-bid-build project to replace the hydraulic bollard system outside the East building three (3) bay loading dock to include the 27 hydraulic bollards and associated equipment and controls. The north and south loading dock bays entrances has ten (10) bollards outside the loading dock doors for protection and the center loading dock bay entrance has seven (7) bollards outside the loading dock door. This requirement is being held for holders of the GC/DB Zone A IDIQ.

Finding similar opportunities...