OpenDue June 20, 2026

DSCR B66D Restroom and Conference Room Repairs

DEPT OF DEFENSE

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

RFI's: The SOW does not appear to identify the total quantity of plumbing fixtures to be replaced. Please confirm the total number of toilets, urinals, and lavatories included in the project. The Contractor shall take their own measurements, quantities, etc. The SOW references replacement toilets and also references Sloan flushometers. Please confirm whether the replacement toilets are intended to be flush valve type fixtures or tank type fixtures. Flush Valve The SOW requires accessible cleanouts for each toilet and urinal. Please confirm whether the project anticipates sawcutting, concrete removal, excavation, and slab restoration work to accommodate these cleanouts, if required. Cleanouts are inwall not floor. The wage determination appears to reference a plumber classification dated 20...