Joint Project Manager Chemical, Biological, Radiological and Nuclear Integrated Early Warning (JPM CBRN IEW) Independently Qualified and Production Capable Chemical Vapor Collector Survey
DEPT OF DEFENSE
About this archived opportunity
The JPM CBRN IEW has requirements that may result in full-rate production and deployment of Chemical Vapor Collectors in tactical environments worldwide. The Government requires a handheld/positionable system capable of collecting and/or preconcentrating known and unknown vapor and aerosol chemical hazards to be analyzed in a mass spectrometer or similar analytical capability. The Chemical Vapor Collectors will operate in a dismounted configuration. The Department of War will use Chemical Vapor Collectors to conduct and/or support their missions. These missions include post-attack monitoring, base defense, decontamination assurance, demasking, dismounted reconnaissance, and field confirmatory chemical analysis in forward operating locations. JPM CBRN IEW is updating market research from both Government and industry to ensure technical readiness and manufacturing readiness information of available capabilities is current and accurate.
Historical details
- Status
- Closed
- Deadline
- July 3, 2026
- First captured
- June 8, 2026
- Publisher reference
- 4007285661dc4f9b9cf5b5e16f292941
Eligibility: No Set aside used. NONE
This opportunity has closed
Joint Project Manager Chemical, Biological, Radiological and Nuclear Integrated Early Warning (JPM CBRN IEW) Independently Qualified and Production Capable Chemical Vapor Collector Survey
by DEPT OF DEFENSE
Get notified when similar opportunities open
We'll save this search and email you when new joint, project, manager opportunities are posted. Free.
Related opportunities
- Man-portable, Handheld, Counter-Unmanned System (MPHC)DEPT OF DEFENSECloses in 7 days
- Modeling, simulation, experimentation, prototyping, demonstration, and assessment of ground-based or ground-launched sensor algorithms, software, hardware, subsystems, and systems enabling advanced fires capabilities for the Army.DEPT OF DEFENSE
- Large Penetrator Warhead Case Assembly ProductionDEPT OF DEFENSECloses in 10 days
- Large Penetrator Warhead Case Assembly ProductionDEPT OF DEFENSECloses in 10 days
- Large Penetrator Warhead Case Assembly ProductionDEPT OF DEFENSECloses in 10 days