FCC Yazoo City - Air Cooled Condensors Replacement
JUSTICE, DEPARTMENT OF
About this archived opportunity
The primary objective of this project is to replace the aging and non-functioning geothermal system at the Federal Prison Camp (FPC) in Yazoo City, Mississippi (p. 1). The contractor will install a new system utilizing three air-cooled condensers to service approximately 15,500 square feet of the Camp Core and Education buildings, while capping and abandoning the original geothermal system in place (p. 1). Key Specifications & Requirements Equipment: High-efficiency, sickle-blade AC fan motors (e.g., ZIEHL-ABEGG) operating at 550 RPM, enclosed in 16-gauge galvanized steel casings (p. 1). Electrical & Sound: Systems must run on 460 main power and maintain a maximum sound pressure level of 46 dBA at 10 meters (p. 1). Pressure Testing: High heat transfer tube and fin coils must be factory leak-tested and sealed at 600 psig (p. 1). Contractor Duties: Pouring concrete equipment pads, core drilling walls, connecting and insulating refrigeration/electrical lines, factory startup, and providing all necessary tools and safety equipment (p. 2). Operational Rules & Constraints Work Hours: Monday through Friday, 7:30 am to 3:30 pm (excluding federal holidays), with a total project timeline not to exceed 150 calendar days (pp. 3-4). Security & Clothing: Workers must be escorted at all times (p. 3). Khaki, olive-green, camouflage, and sleeveless clothing are strictly prohibited (p. 3). Contraband: No electronic devices (cellphones, laptops, tablets), tobacco/vapor products, weapons, or unapproved medications are allowed on site (p. 3). Attached is the SOW. Site visit will be held 6-16-26 at 10 AM CST. Please contact bhwiles@bop.gov if interested in the site visit no later than 6/12/26 12 Noon CST.
Historical details
- Status
- Closed
- Deadline
- June 22, 2026
- First captured
- June 10, 2026
- Publisher reference
- 055107a803384147bcf017e9f9d4ed66
This opportunity has closed
FCC Yazoo City - Air Cooled Condensors Replacement
by JUSTICE, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new yazoo, city, cooled opportunities are posted. Free.
Related opportunities
- Replacement of Chillers and Pumps - FCC Oakdale, LAJUSTICE, DEPARTMENT OFCloses in 66 days
- B1806 Repair Control Tower HVACDEPT OF DEFENSECloses in 23 days
- Install Water Softener and Hot Water Heaters at FCI MendotaJUSTICE, DEPARTMENT OFCloses in 4 days
- FCI Ashland-Replace J&K Unit WindowsJUSTICE, DEPARTMENT OFCloses in 2 days