Repair Control Tower HVAC, B1806
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR EDUCATION AND TRAINING COMMAND.FA3022 14 CONS LGCA
About this archived opportunity
This scope of work outlines the requirements for the replacement of four (4) existing fan-coil HVAC units within the Aircraft Control Tower, Building 1806, at Columbus Air Force Base, MS. The contractor shall provide all labor, materials, tools, transportation, and equipment necessary to complete the work as described within the Statement of Work (SOW), in accordance with all applicable building codes, Air Force regulations, safety regulations, and the manufacturer's installation instructions. This is a sources sought. No award will be made off this posting. This is for market research purposes only. Please review attached SOW for further project details.
Historical details
- Status
- Closed
- Deadline
- June 25, 2026
- First captured
- June 11, 2026
- Publisher reference
- c7b77c730286458780d5aae52950a1db
Eligibility: Total Small Business Set-Aside (FAR 19.5)
This opportunity has closed
Repair Control Tower HVAC, B1806
by DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR EDUCATION AND TRAINING COMMAND.FA3022 14 CONS LGCA
Get notified when similar opportunities open
We'll save this search and email you when new repair, control, tower opportunities are posted. Free.
Related opportunities
- B1806 Repair Control Tower HVACDEPT OF DEFENSECloses in 22 days
- 2027-180000-0707-001113-Group 6-2 HVAC ReplacementHenry County Board Of EducationCloses in 11 days
- B150 HVAC RepairDEPT OF DEFENSECloses in 2 days
- CDC ARSR HVAC ReplacementTRANSPORTATION, DEPARTMENT OFCloses in 18 days
- B522 HVAC, B414 DEMODEPT OF DEFENSECloses in 4 days