Aerospace Systems Technical Research & Operations Support Services II (ASTROS II)
DEPT OF DEFENSE
About this archived opportunity
RELATED NOTICE: This RFI #2 is a continuation of market research initiated under RFI #1 (Notice ID: [FA930027R6000]), which is currently closed/inactive. For the purposes of this Request for Information (RFI), this requirement is temporarily designated as 'ASTROS II.' The Government advises interested parties to track this requirement via the SAM.gov Notice ID, as the official program name is subject to change prior to the issuance of a formal solicitation. AFRL Det 7/SST is conducting market research to provide follow-on capability to evaluate, engineer, reconfigure, modify experimental research test equipment, stands [(Property, Plant, & Equipment) PP&E] and systems, perform research and development test operations and test operation support, maintain special test equipment and support infrastructure as required. The tasks associated with this requirement, also captured in paragraph 4 of the attached Draft PWS, demand specialized knowledge of all aspects of rocket propulsion testing. The scale of testing ranges from small bench-scale liquid engine components and tactical motors to launch booster-class engines and strategic rocket motors. Practical knowledge regarding all intermediate devices including combined cycle designs, spacecraft propulsion, and space and missile propulsion system component testing will also be required. These tasks require a holistic working knowledge of the systems to ensure successful design, integration, test and data collection of integrated advanced propulsion systems and their associated equipment (PP&E) to include, but not limited to steam and mechanical-driven altitude test systems, thrust measurement systems, instrumentation and control systems, equipment deluge and fire retardation systems, special test equipment, additional support infrastructure. Incidental alterations to Real Property (e.g., utility tie-ins, pad penetrations, structural mounting) are authorized only when inextricably linked to, and necessary for, the primary engineering modification of the PP&E test stands. All such ancillary Real Property alterations must be approved by the Contracting Officer and EAFB Civil Engineering. The contractor shall engineer, integrate, modify, activate, operate, and deactivate fuel and oxidizer propellant systems for toxic, storable, hypergolic, cryogenic, high pressure, explosives, and hydrocarbon propellant system assets. In addition, the contractor shall handle, transport and store these propellants and explosives.
Historical details
- Status
- Closed
- Deadline
- June 25, 2026
- First captured
- June 12, 2026
- Publisher reference
- 7832b7429ecc47648895ea6cd076f8b1
Eligibility: No Set aside used. NONE
This opportunity has closed
Aerospace Systems Technical Research & Operations Support Services II (ASTROS II)
by DEPT OF DEFENSE
Get notified when similar opportunities open
We'll save this search and email you when new aerospace, systems, technical opportunities are posted. Free.
Related opportunities
- REQUEST FOR INFORMATION: Solutions to Enhance US Rocket-Based Combined Cycle (RBCC) Propulsion TechnologiesDEPT OF DEFENSE
- Request for Information (RFI) for Specialized Engineering and Technical Services For F-15 Radar Reliability and MaintainabilityDEPT OF DEFENSECloses Dec 2026
- Astrophysics Science Operations SupportNATIONAL AERONAUTICS AND SPACE ADMINISTRATION
- Common Armament Tester for Fighter (CAT-F)DEPT OF DEFENSECloses Dec 2026
- REQUEST FOR INFORMATION: Solutions to Enhance US Rocket-Based Combined Cycle (RBCC) Propulsion TechnologiesDEPT OF DEFENSE
- Project Manager, Short and Intermediate Effectors for Layered Defense Maneuver-Short Range Air Defense Increment 3, Next Generation Short Range Interceptor ProductionDEPT OF DEFENSE