Skip to content
ClosedNo longer accepting applications

NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

AGRICULTURE, DEPARTMENT OF

About this archived opportunity

Please see Tyler Dam Addendum No. 1 in the attachments/links section for further details and updates. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.

Historical details

Status
Closed
Deadline
June 25, 2026
First captured
June 12, 2026
Publisher reference
007f0ef1aa00414482600c2a9436503f

Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA

This opportunity has closed

NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

by AGRICULTURE, DEPARTMENT OF

Get notified when similar opportunities open

We'll save this search and email you when new tyler, rehabilitation, project opportunities are posted. Free.

Refine this search