Remodeling of GYM at the U.S. Embassy Marine House
STATE, DEPARTMENT OF
This opportunity closed July 29, 2026. 3 similar opportunities are open right now.
Similar opportunities open now
- Residential Bathroom Renovation and Drainage UpgradesSame funderOpenSTATE, DEPARTMENT OFCloses in 18 days
- Construction of ABA compliant bathroom in Embassy BratislavaSame funderOpenSTATE, DEPARTMENT OFNo deadline listed
- Z2DA--589A7-25-503 Prepare Site for Cath Lab Equipment FY26 NRMOpenVETERANS AFFAIRS, DEPARTMENT OFCloses in 3 days
About this archived opportunity
This project is for the remodeling of the Gym/Fitness room at the U.S. Embassy Marine House, located in 1190 Vienna. The old room structures and surfaces need improvement and renovation. The existing GYM will be expanded from 55m2 to 62m2, and the bathroom and a wall-cabinet will be demolished for this purpose. Scope of work: General Contractor for Construction work and Electrical Installation Demolition Temporary plasterboard dust wall with door. Demolition of partition walls (10cm), incl. wall coverings, 2 wooden doors+ doorframes and 1 wooden cabinet, electrical installation and equipment, incl. removal and disposal. Demolition, removal and disposal of the existing wall- and floor tiles and in the bathroom, existing sanitary items and equipment in the bathroom, including pipes, and the PVC flooring incl. glue. Removal of 4 existing ceiling lights. Refurbishment Walls and ceiling: plaster, level, clean, prime, paint to cover, incl. 16m2 floor covering material. Floor: Clean, grind and level the floor; New PVC flooring in the demolition area. Delivery and assembly of 6 new ceiling lights in new position, Including switch, wiring, and integration into the existing system. Final cleaning Special requirements The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work USG Security regulations Clearance process for employees, cars, material on site Safety and protective measures Execution periods Indicative construction schedule: 5 weeks in fall 2026
Historical details
- Status
- Closed
- Deadline
- July 29, 2026
- First captured
- June 12, 2026
- Publisher reference
- 11b6afe92d85411aa785df10483d7769
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.
Related opportunities
- Residential Bathroom Renovation and Drainage UpgradesSame funderSTATE, DEPARTMENT OFCloses in 18 days
- Construction of ABA compliant bathroom in Embassy BratislavaSame funderSTATE, DEPARTMENT OF
- Z2DA--589A7-25-503 Prepare Site for Cath Lab Equipment FY26 NRMVETERANS AFFAIRS, DEPARTMENT OFCloses in 3 days