Basketball court reconstruction
STATE, DEPARTMENT OF
This opportunity closed July 29, 2026. 4 similar opportunities are open right now.
Similar opportunities open now
- Construction of ABA compliant bathroom in Embassy BratislavaSame funderOpenSTATE, DEPARTMENT OFNo deadline listed
- Residential Bathroom Renovation and Drainage UpgradesSame funderOpenSTATE, DEPARTMENT OFCloses in 18 days
- Rehabilitate Physical Education Building- Basement, First Floor and Site WorkOpenMLB Construction Services, LLCCloses in 10 days
- Facility Restoration works at ER#6Same funderOpenSTATE, DEPARTMENT OFCloses in 4 days
About this archived opportunity
This project if for the reconstruction of the basketball half-court at the U.S. Embassy Vienna Marine House, located in 1190 Vienna. The existing outdoor basketball half-court is at the end of its life cycle and too small in dimensions. The scope of work includes but is not limited to the demolition of the existing sports field surface and substructure, in their entirety, as well as the removal of the lighting. Construction of a new sports field surface, including the substructure, in its entirety, as well as a new lighting system. Scope of work: General Contractor for Construction of Sport Fields and Electrical Installation - Site Installation - Demolition Demolition, removal and disposal of existing basketball half- court (asphalt layer 7x8m), existing exterior lights and basketball basket with posts Soil removal and disposal for new basketball half- court dimension (13mx14m = 182m�), 0.3m depth = ~55m� - Construction of a new sport field Preparation/installation subgrade/subbase incl. drainage Installation top layer (EPDM rubber surface or equal) Installation point foundation for 1 basketball hoop and for 2 light poles Installation 1 adjustable basketball hoop, and 2 exterior lights incl. cabling/rewiring Laying stone slabs 40x40x5cm around the court Painting lines Final cleaning - Special requirements The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work USG Security regulations Clearance process for employees, cars, material on site Safety and protective measures Execution periods Indicative construction schedule: 5 weeks in fall 2026
Historical details
- Status
- Closed
- Deadline
- July 29, 2026
- First captured
- June 12, 2026
- Publisher reference
- 315bd0cf47be4a308e31a8c0bf41d86c
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.
Related opportunities
- Construction of ABA compliant bathroom in Embassy BratislavaSame funderSTATE, DEPARTMENT OF
- Residential Bathroom Renovation and Drainage UpgradesSame funderSTATE, DEPARTMENT OFCloses in 18 days
- Rehabilitate Physical Education Building- Basement, First Floor and Site WorkMLB Construction Services, LLCCloses in 10 days
- Facility Restoration works at ER#6Same funderSTATE, DEPARTMENT OFCloses in 4 days