Skip to content
ClosedNo longer accepting applications

Barkley Emergency Gate Machinery Inspection

DEPT OF DEFENSE

About this archived opportunity

Contractor shall provide all labor, material, and equipment necessary to clean, disassemble/reassemble, and inspect all lifting machinery for the Barkley Lock Emergency Lift Gate, including but not limited to the limit switch assemblies, motors, enclosed gears, open gears, gear mounting assemblies, drums, sheaves, wire rope, brakes, shaft bearings, couplings, and control equipment. Provide the initial inspection reports with pictures of the equipment that show any deficiencies found during the inspection. Provide touch-up painting for all exterior surfaces of items in the scope of work after inspection except as otherwise noted. If a contract option is exercised, paint the respective components (except as otherwise noted) after the work in the contract option is completed. After completion, provide as-built reports that show as-built fits, backlashes, contact patterns and end floats. Initial inspection reports and as-built reports shall be required for all open gears, limit switch assemblies, and enclosed gears. Mark-up of the PDF for as-builts are acceptable. No CAD drawings shall be required for the as-builts. Provide new oil, grease, filters, fasteners, keys, and others as needed to get the Emergency Gate (E-Gate) machinery ready for operation.

Historical details

Status
Closed
Deadline
July 10, 2026
First captured
June 12, 2026
Publisher reference
41e3406564a740fba4cbcf65d30af4b7

This opportunity has closed

Barkley Emergency Gate Machinery Inspection

by DEPT OF DEFENSE

Get notified when similar opportunities open

We'll save this search and email you when new barkley, emergency, gate opportunities are posted. Free.

Refine this search