S208--Landscape and Decomposed Granite Project POP: 06/20/2026 - 06/19/2027
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.262-NETWORK CONTRACT OFFICE 22 (36C262)
About this archived opportunity
36C26226Q0597 ******* The purpose of this amendment is to do the following: 1. To respond to questions asked regarding this solicitation. 2. The statement of work has been updated. The General Contractor License has been removed from the Statement of Work. 3. The required for submittals have been updated. The General Contractor License requirement has been removed. Please be aware that the response due date has been changed from 6/11/2026 to 6/15/2026 10:00 AM (PSD). Questions and answers: Q. If a contractor is licensed in California as a C-27 landscaping contractor, why is an additional General contractor's license, when we are already licensed as a contractor through the state? Also, the project requires the removal and installation of decomposed granite, small field stone, turf and the installation of bushes. These services typically do not have needs for OSHA certifications. We're requesting that those requirements are removed since it not necessary for the size of this project and is restrictive to the small business companies that can perform this job. A. If the contractor has a valid C-27 license, then a General Contractor s license would not be needed, as the majority of the work is landscaping and would be covered by the C-27 license. Please see the statement of work, we have updated it and removed the requirement for the General Contractors License. However, I would not waive the OSHA 30-hour certification. Their employees are required to have 30-hour General Industry training. Q. What is the depth of DG that the VA wants? A. 2 ½ -3 inches Q. What sizes of Arizona DG does the VA want? A. 3-8 inches Q. What color of Arizona DG does the VA want? A. Southwest Brown Q. What is the VA standard for tree stakes? A. 8 ft wooden stakes Q. For existing rock removal, does the VA want all rock removed from the specified area or removed to a certain depth with new rock on top? A. All existing rocks removed and grading depth for new installation of rock. Q. Does this service contract require Davis Bacon Wages? A. No. Davis Bacon Wage is for construction, this contract is for services. The wage determination that applies to this contract is: Wage Determination # 2015-5629 Rev. 29, dated 05/13/2026. The wage determination can be found at https://sam.gov/wage-determination/2015-5629/29 Q. Please confirm that in the photos with red-marked areas, the requested gravel/river rock will only go in those marked areas and not the whole area. A. Yes Q. Confirm the bender board follows the red markings where the new rock will meet the existing landscaping. A. Yes Q. For the past performance requirement, does the VA want any kind of write-up to be submitted with the submitted CPARS or just the CPARS? How many CPARS does the government require? A. Per solicitaion, Past performance will be based on CPARS and FAPIIS ratings . We have access to the CPARS though a government site. Contractors are not required to submit CPARS, those will be pulled from a government site. Q. The solicitation lists required submittals: OSHA 30, GC license, C-27 License, and CIT Certification. Are these required to be submitted with the proposal or are these required to be submitted post award? A. Offeror must possess a 30-hour Occupational Safety and Health Administration (OSHA), C-27 Landscaping Contractor, and CIT Certification (Certified Irrigation Technician) are required with your solicitation response. Required For Submittals: Proof that the contractor and all personnel performing on the contract have the following technical training and certifications (Failure to include these certifications, will disqualify offeror): Offeror must possess a 30-hour Occupational Safety and Health Administration (OSHA). C-27 Landscaping Contractor. CIT Certification (Certified Irrigation Technician). Prospective Offerors are notified 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, paragraph (d) requires certification to be completed, signed, and returned with the offeror s submission. Failure to include this completed information will preclude the offeror from consideration for award. STATEMENT OF WORK (SOW) TITLE: Landscape and Decomposed Granite Project (VALLHCS) BACKGROUND INFORMATION: The Facility Maintenance Services at VA Loma Linda Healthcare System (VALLHS) is dedicated to maintaining safe and fully functional buildings to support the delivery of high-quality care to veterans. Current upgrades include improving decomposed granite areas, planting new shrubs, and installing an advanced drip irrigation system. Additionally, a new sprinkler system with saturation graphs will be implemented to optimize water coverage accuracy and efficiency. PARTS and EQUIPMENT LIST: Granite and other Materials NAME QTY Decomposed Granite 50,000 sq ft Elite Plus Sodded Turf 100 sq ft 8 ft Wooden Tree Stakes 40 Arizona River Rock 2,400 sq ft Plants NAME Location QTY Crape Myrtle Shrubs -Purple Pond 3 2 C
Historical details
- Status
- Closed
- Deadline
- June 15, 2026
- First captured
- June 12, 2026
- Publisher reference
- e1e0c0bba35b4d37a4fb83d4a7dde928
This opportunity has closed
S208--Landscape and Decomposed Granite Project POP: 06/20/2026 - 06/19/2027
by VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.262-NETWORK CONTRACT OFFICE 22 (36C262)
Get notified when similar opportunities open
We'll save this search and email you when new landscape, decomposed, granite opportunities are posted. Free.
Related opportunities
- J065--Sterrad 100NX Preventative Maintenance and Repair ServicesVETERANS AFFAIRS, DEPARTMENT OF
- Landscaping ServicesDEPT OF DEFENSECloses in 2 days
- Ground Maintenance and Snow Removal ServicesTRANSPORTATION, DEPARTMENT OFCloses in 2 days
- New River Gorge National Park and PreserveTRANSPORTATION, DEPARTMENT OFCloses today
- S--WA-RIDGEFIELD NWR JANITORIAL SERVICESINTERIOR, DEPARTMENT OF THE