Wolf Creek Turbine Generator Rehab
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST NASHVILLE.W072 ENDIST NASHVILLE
About this archived opportunity
REQUEST FOR INFORMATION The Government is issuing this Request for Information for market research purposes. This is not a solicitation. No reimbursement will be made for any costs associated with providing information in response to this survey. This survey is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information. Requirement The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates a requirement for a firm fixed-price construction contract to rehabilitate the turbine generator units at Wolf Creek Powerhouse in Jamestown, Kentucky. The estimated magnitude of this project is between $100,000,000 and $250,000,000. A partial rehabilitation of one of the units at Wolf Creek has recently concluded with an operational unit and may be fully rehabilitated under this contract with replacement of key components. Upon completion, the Project will significantly increase effectiveness, efficiency, and reliability of the hydrogenating units at Wolf Creek Powerhouse. This significant restoration and increase in critical mission factors of the units is the main driver for the Project. The power produced is an economic benefit to the surrounding community since it is provided to local utilities at the minimum possible cost. The rehabilitation effort at Wolf Creek is an extension of the larger decades-long hydropower rehabilitation effort throughout the Cumberland River System. The Contractor will be responsible for the following activities/items under the proposed contract*: This specification includes the requirements for all equipment, labor, materials, and work necessary to design, manufacture and install Francis turbines, improve dissolved oxygen levels, rewind the existing generators Units 1-3 and Unit 5, and refurbish associated equipment and components for all Units 1-6. The runner shall be designed using both Computational Fluid Dynamics (CFD) and a physical performance (scale) model. The latest design and proven technologies shall be applied to develop aerating capability for the replacement turbines. The existing generators will be rewound concurrent with the supply and installation of the turbines. Asbestos abatement shall be performed by others. Abatement is needed in the stator windings, rotor cleaning, brake pad dust, etc. The Government will perform a survey of the asbestos and provide this to the Contractor. The Contractor should plan on not being able to work on each unit for a period of 6 to 8 weeks while asbestos abatement is being performed. The following list is a general summary of the required and optional work for each unit and is not all-inclusive. General Project: The time allotted for design and manufacturing of replacement components for the first unit is estimated to be no more than thirty seven (37) months in duration. The time allotted for unit outage is estimated to be no more than twenty-four (24) months in duration for the first unit and eighteen (18) months for the second unit and follow on units, including all incidental related work. Turbine and Mechanical a. Design and construct a hydraulic model. b. Design, manufacture, prepare and load for shipment, deliver F.O.B. destination, and unload the Francis turbine runner and appurtenances. c. Disassemble generating unit by removing rotating and stationary components and related interferences such as the generator rotor from shaft. d. Perform alignment investigations and provide recommendations. e. Inspect and refurbish, or replace miscellaneous turbine and generator mechanical components and piping including but not limited to: brake cylinders, oil jacking pump, brake rings (optional), wicket gate shear pins, runner wearing rings, and gland, wicket gate packing boxes and glands, seals, runner coupling bolts, and other components as specified. f. Disassemble and inspect and refurbish the wicket gate servomotors. Inspect and refurbish the operating ring (bull ring). g. Replace greased bushings and rehabilitate or replace (using plates, weldments, or sleeves). Work must include line boring of the bottom ring and head cover bushing housings and bushings. h. Provide an aeration system for the turbine, including piping and controls. i. Provide new head covers. j. Provide new wicket gates k. Refurbish turbine and generator guide bearings and generator thrust bearings as directed. Provide detailed dimensional drawing for thrust shoes. Fabricate a new turbine guide bearing. l. Supply new turbine oil. (21,000 Gallons) m. Supply and install RTDs replacements for each bearing, including the addition of one RTD per shoe for the thrust bearings. n. Replace cooling and packing water piping 1 ½ inch and smaller for steel piping or 3 inch and smaller for copper and stainless steel piping. o. Reassemble generating unit with a new turbine runner and appurtenances and other rehabilitated and replacement components. p. Clean turbine pit, generator, and work or s
Historical details
- Status
- Closed
- Deadline
- June 26, 2026
- First captured
- June 12, 2026
- Publisher reference
- daf910d55e904f06b4faebd2ffceef41
This opportunity has closed
Wolf Creek Turbine Generator Rehab
by DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST NASHVILLE.W072 ENDIST NASHVILLE
Get notified when similar opportunities open
We'll save this search and email you when new wolf, creek, turbine opportunities are posted. Free.
Related opportunities
- Z--Grand Coulee Washington Power Plant Turbine RepairINTERIOR, DEPARTMENT OF THECloses in 9 days
- Z--WA QUICENE NFH GNRTR RPCMT ISO BLDINTERIOR, DEPARTMENT OF THECloses in 10 days
- WA QUICENE NFH GNRTR RPCMT ISO BLDINTERIOR, DEPARTMENT OF THECloses in 10 days
- Hungry Horse Power Plant Turbine Runner CavitationINTERIOR, DEPARTMENT OF THECloses in 8 days
- Retamal Dam Building and GeneratorINTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICOCloses in 8 days
- Z--Hungry Horse Power Plant Turbine Runner CavitationINTERIOR, DEPARTMENT OF THECloses in 8 days