Skip to content
ClosedNo longer accepting applications

ENVIRONMENTAL ASSESSMENT FOR REPAIR OF OVERHEAD 70kV TRANSMISSION LINE South Loop 2 VSFB, CA

DEPT OF DEFENSE

About this archived opportunity

Based on the Statement of Work, the contractor will provide the services necessary to prepare a comprehensive Environmental Assessment (EA) for the repair of an overhead 70kV transmission line at Vandenberg Space Force Base. This includes project management, data collection, and extensive coordination with government and regulatory stakeholders. The core of the work involves conducting detailed technical analyses of the project's impact on cultural resources, natural resources (including wetlands and special status species), and construction noise. The contractor will produce a series of documents, including a Description of Proposed Action and Alternatives (DOPAA) and various technical reports. Ultimately, this effort will result in a legally sufficient EA document that will lead to a Finding of No Significant Impact (FONSI), a mitigated FONSI, or a determination that a full Environmental Impact Statement (EIS) is necessary. Interested vendors shall submit a capability statement and other relevant information NLT 30 June 2026 at 1400 PDT.

Historical details

Status
Closed
Deadline
June 30, 2026
First captured
June 16, 2026
Publisher reference
ab3ccf4b5efa4c1eb7c1051da723981e

Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA

This opportunity has closed

ENVIRONMENTAL ASSESSMENT FOR REPAIR OF OVERHEAD 70kV TRANSMISSION LINE South Loop 2 VSFB, CA

by DEPT OF DEFENSE

Get notified when similar opportunities open

We'll save this search and email you when new south, loop opportunities are posted. Free.

Refine this search