North East River Maintenance Dredging, Cecil County, MD
DEPT OF DEFENSE
About this archived opportunity
The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.
Historical details
- Status
- Closed
- Deadline
- June 30, 2026
- First captured
- June 16, 2026
- Publisher reference
- 0dc1aa6bfb86429e98ab07aa6ce22322
Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA
This opportunity has closed
North East River Maintenance Dredging, Cecil County, MD
by DEPT OF DEFENSE
Get notified when similar opportunities open
We'll save this search and email you when new north, east, river opportunities are posted. Free.