Annual Health & Safety Audit
ARCHITECT OF THE CAPITOL
Place of performance: Washington, DC
Free. Verify your email, then we send one reminder only.
- Posted
- Jun 19, 2026
- Closes
- Aug 13, 2026 (in 10 days)
Similar opportunities open now
- R425--36C262-26-AP-4943 | 664-26-3-5034-0061 | FOLLOW ON PRIOR 36C26225N1150 | SBAR Approved | LINE SAFETY DRAWINGS BLDG 26(VA-26-00063102)OpenVETERANS AFFAIRS, DEPARTMENT OFNo deadline listed
- Self Contained Breathing Apparatus, Breathing Air and Gas Meter MaintenanceOpenVETERANS AFFAIRS, DEPARTMENT OFNo deadline listed
- VA Northern Indiana Health Care Systems Boiler Safety Device Testing, Program Development and TrainingOpenVETERANS AFFAIRS, DEPARTMENT OFCloses in 4 days
- Steam Tunnel Ventilation ReplacementOpenCOMMERCE, DEPARTMENT OFCloses in 2 days
- J044 - VA Northern Indiana Health Care Systems Boiler Safety Device Testing, Program Development and TrainingOpenVETERANS AFFAIRS, DEPARTMENT OFCloses in 4 days
At a glance
This is a government contract opportunity posted by ARCHITECT OF THE CAPITOL in the engineering services category. The deadline is August 13, 2026, 11 days from now. Work is performed in Washington, DC.
Classification and identifiers
- Industry (NAICS)
- Engineering Services (541330)
- Product or service (PSC)
- Other Quality Control, Testing and Inspection Services: Pipe, Tubing, Hose, and Fittings (H947)
- Solicitation number
- AOCACB26R0033
- Contracting office
- ACQUISITION & MATERIAL MAN. DIV.
Who can apply
No Set aside used. NONE
About this opportunity
The objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety concerns, and the probable cause. The report shall also identify if there is a potential for tunnel or pipe failure or other imminent concerns. The report shall also address noted changes in the condition of the tunnel as it relates to past reports or audits, including but not limited to the acceleration of concrete spalling de-laminations, cracks, damages to pipe insulation, ...
Related opportunities
- R425--36C262-26-AP-4943 | 664-26-3-5034-0061 | FOLLOW ON PRIOR 36C26225N1150 | SBAR Approved | LINE SAFETY DRAWINGS BLDG 26(VA-26-00063102)VETERANS AFFAIRS, DEPARTMENT OF
- Self Contained Breathing Apparatus, Breathing Air and Gas Meter MaintenanceVETERANS AFFAIRS, DEPARTMENT OF
- VA Northern Indiana Health Care Systems Boiler Safety Device Testing, Program Development and TrainingVETERANS AFFAIRS, DEPARTMENT OFCloses in 4 days
- Steam Tunnel Ventilation ReplacementCOMMERCE, DEPARTMENT OFCloses in 2 days
- J044 - VA Northern Indiana Health Care Systems Boiler Safety Device Testing, Program Development and TrainingVETERANS AFFAIRS, DEPARTMENT OFCloses in 4 days
- Testing & Inspecting, Preventative Maintenance (PM), Corrective Repairs, Emergency Repairs, and Service Calls for facility the VA Cogeneration and Boiler Chiller PlantVETERANS AFFAIRS, DEPARTMENT OF