Skip to content
Deadline passedDue June 17, 2026·Updated June 19, 2026

U.S. COAST GUARD Air Station Astoria Repaint Interior Spaces

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE SEATTLE(00033)

Who can apply

Small business

Total Small Business Set-Aside (FAR 19.5)

About this opportunity

AMMENDMENT 003 6/18/2026: Updated SOW and drawings 1&2. AMMENDMENT 002 6/17/2026: Q&A for RFI bid walk. Is the contractor responsible for patching cracks in cinder blocks in stairwells prior to painting? Only cracks with out indicators to be installed before work starts. What is required when patching walls along the transition to the ceiling since not painting the ceiling? Clean transitions lines with no more than 1/8” gap after patching. What is the required final wall texture? (lots of different textures exist currently, AIRSTA has no specific texture request) Have no specific texture, so long as no more than 3/8” nap rollers are used. Is there a list of room square footage available? Room Floor Dimensions can be found in the SOW Appendix Drawing. AMMENDMENT 001 6/12/2026: Updated the D...

Finding similar opportunities...