Skip to content
ClosedNo longer accepting applications

WATER SYSTEM FAULTY PROGRAMMABLE LOGIC CONTROLER REPLACEMENT

STATE, DEPARTMENT OF

This opportunity closed July 18, 2026. 5 similar opportunities are open right now.

Get alerted when new contract opportunities like this open.

Checking your account…

Free. Everyone sees new listings after 10 days. Unsubscribe anytime.

About this archived opportunity

The U.S. Embassy in Bujumbura, Burundi, has a requirement to replace the faulty Programmable Logic Controller (PLC) of its Domestic Water Treatment Plant (DWTP) and integrate BACnet communication to enable connectivity with the Building Automation System (BAS). This upgrade will allow the Facilities Team to monitor water levels, production, and distribution to Embassy buildings in real time, in accordance with the attached Statement of Work (SOW). The existing PLC, an Allen-Bradley MicroLogix 1200, has experienced a fatal internal failure and must be replaced. All interested vendors are requested to submit their best and final quotation no later than July 18, 2026, at 10:00 a.m. Bujumbura time, for the following requirement: Domestic Water Treatment Plant (DWTP) System – PLC Supply, Installation, Programming, Integration, Testing, and Commissioning Services Vendors must provide a detailed and itemized price quotation. Lump-sum or incomplete pricing that does not clearly identify individual components and services may not be considered during the evaluation process. Each line item should include sufficient detail for technical and price analysis. The quotation should, at a minimum, include the following categories: 1. Staff Services Technical personnel Labor costs Travel expenses Accommodation and per diem (if applicable) Engineering and programming services Testing and commissioning services 2. Materials and Equipment PLC hardware and accessories BACnet communication modules and interfaces Software licenses (if applicable) Control panels, cables, connectors, and related components Any additional equipment required for a complete installation 3. Installation and Commissioning Removal of existing PLC Installation of new PLC and associated equipment Programming and system configuration BAS integration and BACnet communication setup Functional testing System commissioning Operator training and documentation Please ensure that all proposed equipment and services comply with the requirements specified in the attached Statement of Work. For any question, please send it to: NiyongaboS@state.gov with title: 19BY7026Q0010 Question Questions will be compiled until July until June 30, 2026 and answers will be posted on sam.gov on July 3, 2026.

Historical details

Status
Closed
Deadline
July 18, 2026
First captured
June 23, 2026
Publisher reference
f6cb6a21eb1948848158a18d8378f4a2

Eligibility: No Set aside used. NONE

This opportunity has closed

WATER SYSTEM FAULTY PROGRAMMABLE LOGIC CONTROLER REPLACEMENT

by STATE, DEPARTMENT OF

Get notified when similar opportunities open

We'll save this search and email you when new opportunities are posted. Free.

Refine this search