Skip to content
ClosedNo longer accepting applications

CGC KUKUI DRYDOCK

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.SFLC PROCUREMENT BRANCH 2(00085)

This opportunity closed July 10, 2026. 5 similar opportunities are open right now.

Get alerted when new contract opportunities like this open.

Checking your account…

Free. Everyone sees new listings after 10 days. Unsubscribe anytime.

About this archived opportunity

Sources Sought Title: USCGC KUKUI (WLB 203) DRYDOCK (DD) Repairs The U.S. Coast Guard is looking for sources which would be interested in performing Drydock repairs for Coast Guard Cutter KUKUI (WLB 203). USCGC KUKUI (WLB 203) is a 225-foot Seagoing Buoy Tender USCGC KUKUI HOMEPORT ADDRESS: 1480 Seward Avenue, Sitka, AK. 99835 ANTICIPATED PERIOD OF PERFORMANCE: 02 February 2027 to 18 May 2027. (Subject to change) DISTRICT 17- ALASKA: This requirement is for a vessel that is homeported in Coast Guard District 17 Alaska. This requirement will be in accordance with NDAA FY 2021 Section 8820, Shipyard Provision, Section 8220, VESSEL CONVERSION, ALTERATION, AND REPAIR PROJECTS. PLACE OF PERFORMANCE: Contractors Facility The scope of this acquisition is for the drydock repairs of various work items for USCGC KUKUI. The work will include, but is not limited to: WORK ITEM 1: Fire Prevention Requirements WORK ITEM 2: Hull Plating, Side Scan, Ultrasonic Testing WORK ITEM 3: Hull Plating, U/W Body, Inspect WORK ITEM 4: Hull Plating, U/W Body, Ultrasonic Testing WORK ITEM 5: U/W Body, Preserve, 100 percent WORK ITEM 6: Hull Plating Freeboard, Preserve, Partial WORK ITEM 7: Appendages, U/W, Leak Test WORK ITEM 8: Propulsion Shaft Fairwaters And Rope Guards, Inspect WORK ITEM 9: Appendages, U/W, Internal, Preserve WORK ITEM 10: Chain Lockers, Clean and Inspect WORK ITEM 11: Voids, Non-Accessible, Leak Test WORK ITEM 12: Voids, Non-Accessible, Internal Surfaces, Preserve WORK ITEM 13: Tanks, Ballast, Clean and Inspect WORK ITEM 14: Tanks, Dirty Oil and Waste, Clean and Inspect WORK ITEM 15: Main Reduction Gear, Overhaul WORK ITEM 16: Stern Tube Interior Surfaces, Preserve, 100 Percent WORK ITEM 17: Heat Exchangers, Clean, Inspect And Hydro WORK ITEM 18: SSDG Isolation Mounts, Renewal WORK ITEM 19: Fathometer Transducer, Renew WORK ITEM 20: Sea Valves and Waster Pieces, Overhaul Or Renew WORK ITEM 21: Sea Strainers, Duplex, All Sizes, Overhaul WORK ITEM 22: Sea Strainers, Simplex, All Sizes, Clean and Inspect WORK ITEM 23: Sea Bay, Preserve - Partial WORK ITEM 24: Sea Bay, Clean and Inspect WORK ITEM 25: Sea Bay, Preserve 100% WORK ITEM 26: Rudders, Preserve, 100 Percent WORK ITEM 27: Rudder Stock Bearings, Check Clearances WORK ITEM 28: Rudder, Inspect And Repair WORK ITEM 29: Rudder and Rudder Stock, Remove and Inspect WORK ITEM 30: Rudder Bearings, Renewal WORK ITEM 31: Thruster Units (Bow And Stern), Overhaul WORK ITEM 32: Thruster Unit Bearings, Renew WORK ITEM 33: Anchor Windlass, Inspect and Service WORK ITEM 34: Anchor Chains and Ground Tackle, Inspect and Repair WORK ITEM 35: Hull Fittings (Mooring and Towing), Inspect and Test WORK ITEM 36: Accessible Voids, Preserve, 100 Percent WORK ITEM 37: Tanks, Ballast, Preserve, 100 Percent WORK ITEM 38: Tanks, Ballast, Preserve, Partial WORK ITEM 39: Chain Locker, Preserve, 100 Percent WORK ITEM 40: Chain Lockers, Preserve, Partial WORK ITEM 41: Accessible Void(s), Preserve, Partial, WORK ITEM 42: Tanks, Potable Water Preserve, 100 Percent WORK ITEM 43: Tanks, Potable Water, Preserve, Partial, WORK ITEM 44: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 45: Hull Plating Freeboard (Buoy Port Areas), Preserve WORK ITEM 46: Superstructure, Preserve, 100 Percent WORK ITEM 47: Cathodic Protection, Zinc Anodes, Renew, WORK ITEM 48: Impressed Current Cathodic Protection System, Inspect and Maintain WORK ITEM 49: Impressed Current, Cathodic Protection System, Reference Cells, Renew WORK ITEM 50: Drydock WORK ITEM 51: Temporary Services, Provide - Cutter WORK ITEM 52: Sea Trial Performance, Support, Provide WORK ITEM 53: Bilges, Preserve WORK ITEM 54: Anchor Pocket Modify WORK ITEM 55: ATON Tie-down Install WORK ITEM 56: Main Reduction Gear Filter Assembly, Replace WORK ITEM 57: Thruster Motor, ReplaceWORK ITEM 58: Forward Hydraulic Unit, Inspect and ServiceWORK ITEM 59: Dining ProvideWORK ITEM 60: Lodging ProvideWORK ITEM 61: Independent NACE Inspector (Level 3), ProvideWORK ITEM 62: Tenting, ProvideWORK ITEM 63: Propulsion Shafting; Remove, Inspect, and ReinstallWORK ITEM 64: Propulsion Shaft Seals, Mechanical Overhaul And Inflatable RenewalWORK ITEM 65: Propulsion Shaft Seals, Bulkhead, OverhaulWORK ITEM 66: Propulsion Shafting, Optical or Laser Alignment Check WORK ITEM 67: Propulsion Tail Shaft Sleeve, Skim Cut WORK ITEM 68: Propulsion Shaft Bearings, External, Check Clearances WORK ITEM 69: Propulsion Shaft Bearing, Stave Renewal WORK ITEM 70: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 71: Controllable Pitch Propeller, System Maintenance, Perform WORK ITEM 72: Controllable Pitch Propeller Hub, General Maintenance with EAL, Perform WORK ITEM 73: Controllable Pitch Propeller Hub, Remove and Reinstall WORK ITEM 74: Controllable Pitch Propeller, Fluid Replace WORK ITEM 75: Fluxgate Digital Compass System, Upgrade WORK ITEM 76: Hull and Structural Plating, General, 102 lbs Steel, Renew WORK ITEM 77: Hull and Structural Plating, General, 1275

Historical details

Status
Closed
Deadline
July 10, 2026
First captured
June 28, 2026
Publisher reference
cc5cd44ddfe6477992134a16ae7be7a3

Eligibility: No Set aside used

This opportunity has closed

CGC KUKUI DRYDOCK

by HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.SFLC PROCUREMENT BRANCH 2(00085)

Get notified when similar opportunities open

We'll save this search and email you when new opportunities are posted. Free.

Refine this search