Skip to content
ClosedNo longer accepting applications

Fort Lee Vehicle Recovery Range

DEPT OF DEFENSE

This opportunity closed July 28, 2026.

About this archived opportunity

Amendment 0001: An amenedment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0001, to view the summary of changes, including site visit information. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.

Historical details

Status
Closed
Deadline
July 28, 2026
First captured
June 30, 2026
Publisher reference
ec745ba54a054d79a777f2701ea3795c

Eligibility: 8a Competed. 8A

Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.

Refine this search