RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
DEPT OF DEFENSE
This opportunity closed July 20, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICOSame funderOpenDEPT OF DEFENSECloses in 5 days
- Industry Outreach Event - Guajataca Dam Permanent Repair ProjectSame funderOpenDEPT OF DEFENSENo deadline listed
- Disaster Overseas Transportation Support - U.S. Virgin Islands/Puerto RicoOpenHOMELAND SECURITY, DEPARTMENT OFCloses in 7 days
- Fords Lake Dam Dam Rehabilitation ProjectOpenPennsylvania Fish and Boat CommissionCloses in 25 days
- Design-Build Services for the Bridge of the Americas (BOTA) Land Port of Entry (LPOE) Modernization Project, El Paso, TexasOpenGENERAL SERVICES ADMINISTRATIONCloses in 62 days
About this archived opportunity
June 26 2026 Notice: Site-Visit Sign-In Sheet and Power Point Presentation has been uploaded to this notice. THIS REQUEST FOR PROPOSAL (RFP) WILL RESULT IN AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCTION CONTRACT. GENERAL SCOPE OF WORK: REFER TO SECTION 00 31 32.THE NORTH AMERICAN INDUSTRY CLASSIFICATION (NAICS) IS CODE 237990, WITH A SMALL BUSINESS STANDARD SIZE STANDARD OF $45 MILLION.PROJECT MAGNITUDE: FOR INFORMATIONAL AND BONDING PURPOSES, THE ESTIMATED MAGNITUDE OF THIS CONSTRUCTION PROJECT IS BETWEEN $300,000,000 AND $400,000,000. AN ORGANIZED SITE-VISIT HAS BEEN SCHEDULED. SEE SECTION 00 73 00 FOR DETAILS.*** OFFERORS ARE NOTIFIED THAT ALL REAL ESTATE RIGHTS HAVE NOT YET BEEN OBTAINED FOR ACCESS TO THE ENTIRE CONSTRUCTION SITE. OUTSTANDING RIGHTS NEEDED TO PROVIDE THE CONTRATOR ACCESS TO CONTRUCT THE PROJECT WILL BE OBTAINTED BEFORE ISSUANCE OF THE FULL NOTICE TO PROCEED. ***
Historical details
- Status
- Closed
- Deadline
- July 20, 2026
- First captured
- June 30, 2026
- Publisher reference
- a6c7c79a128d4efdbf43e7246acaea30
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.
Related opportunities
- RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICOSame funderDEPT OF DEFENSECloses in 5 days
- Industry Outreach Event - Guajataca Dam Permanent Repair ProjectSame funderDEPT OF DEFENSE
- Disaster Overseas Transportation Support - U.S. Virgin Islands/Puerto RicoHOMELAND SECURITY, DEPARTMENT OFCloses in 7 days
- Fords Lake Dam Dam Rehabilitation ProjectPennsylvania Fish and Boat CommissionCloses in 25 days
- Design-Build Services for the Bridge of the Americas (BOTA) Land Port of Entry (LPOE) Modernization Project, El Paso, TexasGENERAL SERVICES ADMINISTRATIONCloses in 62 days