Basketball court reconstruction
STATE, DEPARTMENT OF
This opportunity closed July 29, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- Renewal parquet floorSame funderOpenSTATE, DEPARTMENT OFCloses in 4 days
- BL113-26 Construction of Lenora Park Basketball CourtsOpenGwinnett County GovernmentCloses in 13 days
- RFP 2027-03 TENNIS COURT RESURFACINGOpenHabersham County Board Of CommissionersCloses today
- Construct Parking and Roadway Camp Murray, WAOpenDEPT OF DEFENSENo deadline listed
- FY27 Secure Facilities Design-Build (DB) and Design-Bid-Build (DBB) Construction Multiple Award Task Order (MATOC)OpenDEPT OF DEFENSENo deadline listed
About this archived opportunity
This solicitation is for reconstruction of the basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria. The work includes but is not limited to the following tasks – all as specified in the attached Statement of Work: Demolition Demolition, removal and disposal of existing basketball half- court (asphalt layer 7x8m), existing exterior lights and basketball basket with posts Soil removal and disposal for new basketball half- court dimension (13mx14m = 182m²), 0.3m depth = ~55m³ RConstruction of a new sport field Preparation/installation subgrade/subbase incl. drainage Installation top layer (EPDM rubber surface or equal) Installation point foundation for 1 basketball hoop and for 2 light poles Installation 1 adjustable basketball hoop, and 2 exterior lights incl. cabling/rewiring Laying stone slabs 40x40x5cm around the court Painting lines Final cleaning Special requirements: The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work USG Security regulations Clearance process for employees, cars, material on site Safety and protective measures
Historical details
- Status
- Closed
- Deadline
- July 29, 2026
- First captured
- June 30, 2026
- Publisher reference
- 50a2cbcfedf04b668184085b0db502eb
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.
Related opportunities
- Renewal parquet floorSame funderSTATE, DEPARTMENT OFCloses in 4 days
- BL113-26 Construction of Lenora Park Basketball CourtsGwinnett County GovernmentCloses in 13 days
- RFP 2027-03 TENNIS COURT RESURFACINGHabersham County Board Of CommissionersCloses today
- Construct Parking and Roadway Camp Murray, WADEPT OF DEFENSE
- FY27 Secure Facilities Design-Build (DB) and Design-Bid-Build (DBB) Construction Multiple Award Task Order (MATOC)DEPT OF DEFENSE
- Renovate Base ChapelDEPT OF DEFENSECloses in 10 days