Basketball court reconstruction
STATE, DEPARTMENT OF
About this opportunity
This solicitation is for reconstruction of the basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria. The work includes but is not limited to the following tasks – all as specified in the attached Statement of Work: Demolition Demolition, removal and disposal of existing basketball half- court (asphalt layer 7x8m), existing exterior lights and basketball basket with posts Soil removal and disposal for new basketball half- court dimension (13mx14m = 182m²), 0.3m depth = ~55m³ RConstruction of a new sport field Preparation/installation subgrade/subbase incl. drainage Installation top layer (EPDM rubber surface or equal) Installation point foundation for 1 basketball hoop and for 2 light poles Installation 1 adjustable basketball hoop, and 2 exterior lights incl. cabli...