Skip to content
ClosedNo longer accepting applications

Remodeling of GYM at the U.S. Embassy Marine House

STATE, DEPARTMENT OF

This opportunity closed July 29, 2026. 4 similar opportunities are open right now.

About this archived opportunity

This solicitation is for remodeling of the Gym/Fitness room at the U.S.Tri Mission Marine House in Vienna Austria The work includes but is not limited to the following tasks – all as specified in the attached Statement of Work: Demolition Temporary plasterboard dust wall with door. Demolition of partition walls (10cm), incl. wall coverings, 2 wooden doors+ doorframes and 1 wooden cabinet, electrical installation and equipment, incl. removal and disposal. Demolition, removal and disposal of the existing wall- and floor tiles and in the bathroom, existing sanitary items and equipment in the bathroom, including pipes, and the PVC flooring incl. glue. Removal of 4 existing ceiling lights. Refurbishment Walls and ceiling: plaster, level, clean, prime, paint to cover, incl. 16m2 floor covering material. Floor: Clean, grind and level the floor; New PVC flooring in the demolition area. Delivery and assembly of 6 new ceiling lights in new position, Including switch, wiring, and integration into the existing system. Final cleaning Special requirements: The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work USG Security regulations Clearance process for employees, cars, material on site Safety and protective measures

Historical details

Status
Closed
Deadline
July 29, 2026
First captured
June 30, 2026
Publisher reference
4dbb510cb28c44f998df09e9d1631ea2

Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.

Refine this search