MMW Chiller For Balance of Plant
ENERGY, DEPARTMENT OF
This opportunity closed July 20, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- Z2DA--657A5-21-401, Construct New Campus Chiller Plant, MRNOpenVETERANS AFFAIRS, DEPARTMENT OFCloses in 15 days
- 500-Ton Trailer-Mounted Air-Cooled ChillerOpenNATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNo deadline listed
- Buckley SFB Chiller ReplacementOpenDEPT OF DEFENSENo deadline listed
- Replacement of Chillers and Pumps - FCC Oakdale, LAOpenJUSTICE, DEPARTMENT OFCloses in 44 days
- Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101OpenVETERANS AFFAIRS, DEPARTMENT OFCloses in 2 days
About this archived opportunity
This procurement is for a single, self-contained, outdoor-rated 20-ton air-cooled industrial process chiller system complete with an integrated glycol pump and glycol buffer tank system. The primary function of this equipment is to cool and circulate a 50%/50% propylene glycol/water mixture at a set temperature of 35°F (with a flow rate of 60–90 GPM) to condense and dry water out of a hydrogen stream generated by a proton exchange membrane (PEM) electrolyzer. The system must operate under variable loads and survive extreme ambient outdoor conditions at an elevation of 6,000 feet.
Historical details
- Status
- Closed
- Deadline
- July 20, 2026
- First captured
- July 2, 2026
- Publisher reference
- 69dba593106e4a6aa26cf1cd4205835a
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.
Related opportunities
- Z2DA--657A5-21-401, Construct New Campus Chiller Plant, MRNVETERANS AFFAIRS, DEPARTMENT OFCloses in 15 days
- Z2DA--657A5-21-401, Construct New Campus Chiller Plant, MRNVETERANS AFFAIRS, DEPARTMENT OFCloses in 15 days
- 500-Ton Trailer-Mounted Air-Cooled ChillerNATIONAL AERONAUTICS AND SPACE ADMINISTRATION
- Buckley SFB Chiller ReplacementDEPT OF DEFENSE
- Replacement of Chillers and Pumps - FCC Oakdale, LAJUSTICE, DEPARTMENT OFCloses in 44 days
- Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101VETERANS AFFAIRS, DEPARTMENT OFCloses in 2 days