L7-090 Repair and Liner - Chemical Storage Tanks
DEPT OF DEFENSE
This opportunity closed July 2, 2026. 4 similar opportunities are open right now.
Similar opportunities open now
- 36 MXG Corrosion Control Repair and Paint ServicesSame funderOpenDEPT OF DEFENSECloses in 5 days
- IFB/GS/DWM/2606-1260241/Polymer Blending Units, Parts, Repairs and Ancillary ServicesOpenAtlanta, City OfCloses tomorrow
- RFI Water Tanker Truck RepairSame funderOpenDEPT OF DEFENSENo deadline listed
- Kit, Repair MinorOpenHOMELAND SECURITY, DEPARTMENT OFNo deadline listed
About this archived opportunity
This solicitation is being conducted under Simplified Acquisition Procedures (SAP) as a Request for Quote (RFQ) No. FA857126QOO87. This requirement is being solicited as a single source requirement to the Original Equipment Manufacturer (OEM) for the repair of L7-090 Liner and purchase of one (1) additional L7-090 Liner. The Contractor shall provide all the tools, parts, materials, equipment, labor, repairs, and travel necessary to perform repairs on the existing Polyvinylidene Flouride (PVDF) L7-090 Liner for the Chemical Storage Tank in Building 20128 and supply one (1) new L7-090 Liner for the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. The Contractor shall repair the existing liner in the facility inside of L7-090. The additional spare liner shall be identical in contruction, material, and instrumentation to the existing liner and be stored by CMXG for future use. The Contractor shall provide the following: • Repair of L7-090 Liner on Tank 120 at Building 20128. This will include one (1) technician to facilitate repairs. • 1 each (PVDF) Kynar® Rigid Box Liner to fit CMXG’s existing tank • Approximately 48” x 48” x 72” deep, fabricated from ¼” thick Kynar 2850 Flex sidewalls and rim and 3/8” thick Kynar 2850 Flex bottom. Liner will be fabricated incorporating Patented (#8,133,345) N-FUZE lining technology, utilizing pressure butt-welded vertical joints and extrusion welded sidewall to bottom contruction. The tank shall have one (1) 45 degree corner where CMXG can re-install existing TANKeye Plus Leak Dectection System Amendment 0001 corrects Period of Performance for CLIN 0002 and adjust responses due date to account for the High Priority need of this effort.
Historical details
- Status
- Closed
- Deadline
- July 2, 2026
- First captured
- July 2, 2026
- Publisher reference
- 1136724f8b7547b0b34908c3d3a36b15
Eligibility: No Set aside used. NONE
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.
Related opportunities
- 36 MXG Corrosion Control Repair and Paint ServicesSame funderDEPT OF DEFENSECloses in 5 days
- 36 MXG Corrosion Control Repair and Paint ServicesSame funderDEPT OF DEFENSECloses in 5 days
- IFB/GS/DWM/2606-1260241/Polymer Blending Units, Parts, Repairs and Ancillary ServicesAtlanta, City OfCloses tomorrow
- RFI Water Tanker Truck RepairSame funderDEPT OF DEFENSE
- Kit, Repair MinorHOMELAND SECURITY, DEPARTMENT OF