Skip to content
ClosedNo longer accepting applications

New Eaton UPS Battery & Rental

DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA WARFARE CENTER.COMMANDING OFFICER

This opportunity closed July 6, 2026. 5 similar opportunities are open right now.

About this archived opportunity

Please see attached Sources Sought Notice and Statement of Work. Questions w Answers Could the Government please provide the required electrical characteristics for the permanent UPS system, including input/output voltage, phase, and frequency? Input/Output Voltage: 208V or 220V, 3-phase power supply. Could the Government please specify the required battery backup runtime for the permanent UPS system? The system needs to provide 480 minutes of runtime. Are existing electrical one-line diagrams, as-built drawings, or other relevant electrical drawings for Building 1524 available to support development of the ROM estimate? No. Could the Government please clarify the required maintenance bypass configuration for the new UPS installation? To prevent any disruption to critical operations, the Government requires the installation of a temporary UPS system to support the active load prior to decommissioning the legacy unit and installing the new permanent Eaton 93PM system.

Historical details

Status
Closed
Deadline
July 6, 2026
First captured
July 2, 2026
Publisher reference
98123c597845455396aba5e51af6b95e

Eligibility: Total Small Business Set-Aside (FAR 19.5)

Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.

Refine this search