Upper Baker Installing Trailer Pads and Utilities
AGRICULTURE, DEPARTMENT OF
This opportunity closed August 10, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- ACC002 Utilities and InfrastructureOpenDEPT OF DEFENSENo deadline listed
- SB006-27 Baker Carter Pressure Improvement ProjectOpenLawrenceville, City OfCloses in 4 days
- New Water Lines at River Forks Park & CampgroundOpenHall County Board Of CommissionersCloses in 18 days
- ITB - HERSHBERGER, FRALIN, & CURTIS WATERLINE PH 1OpenWestern Virginia Water AuthorityCloses in 10 days
- IFB No. 27-001 Construction Services for Highway 99 Water and Sewer ExtensionOpenBrunswick-Glynn County Joint Water & Sewer CommissCloses in 9 days
About this archived opportunity
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code. Option Items – Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements. Crushed Aggregate – Grade G Road Base for the trailer pads and roadway
Historical details
- Status
- Closed
- Deadline
- August 10, 2026
- First captured
- July 8, 2026
- Publisher reference
- 951967d44bd44757925a825597357cf3
Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.