Replace R22 HVAC System and Siemens Controls Upgrade
DEPT OF DEFENSE
This opportunity closed July 17, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- B836 Replace Electrical in Airfield Lighting VaultSame funderOpenDEPT OF DEFENSECloses in 16 days
- Replace AAS BAK-15 Controls, B2001, B2003Same funderOpenDEPT OF DEFENSECloses tomorrow
- B268 Replace STUS Backup GeneratorSame funderOpenDEPT OF DEFENSECloses in 11 days
- 182d Airlift Wing Repair Base Fire Alarm SystemSame funderOpenDEPT OF DEFENSECloses in 8 days
- CES Expansion UPS UpgradeSame funderOpenDEPT OF DEFENSECloses in 2 days
About this archived opportunity
Update Number 0002: Additional site pictures have been uploaded on 8 Jul 26 (18 pictures).Amendment 0001: The following documents have been updated and/or uploaded.- Statement of Work dated 25 Jun 26- Limited Competition Justification-Brand Name-Siemens-Unprotected- Site Visit Attendance Sheet- Site Visit Agenda- Site Pictures (10 Buildings)- RFI (Questions and Answers)The response deadline has been extended until 17 July 2026, 16:00 EDT.The contractor shall furnish all tools, labor, equipment, transportation, and parts necessary to replace the R22 HVAC System and to upgrade the Siemens Controls, to include the Field Panel Controllers at B3212, and the Siemens Legacy Field Panel Controllers in B1217, B1225, B1228, B1234, B3029, B3030, B3119, B3236, and B3252, to be in compliance with Joint Base Andrews (JBA) Civil Engineering design guidelines, Public Laws, Federal Regulations, and manufacturer?s instructions.
Historical details
- Status
- Closed
- Deadline
- July 17, 2026
- First captured
- July 9, 2026
- Publisher reference
- 95429b9d8d9f4d31b32e1ee4a408e41d
Eligibility: Total Small Business Set-Aside (FAR 19.5)
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.