GAOA South Park Office Rehab Pike National Forest
AGRICULTURE, DEPARTMENT OF
This opportunity closed August 11, 2026.
About this archived opportunity
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery for the following: 1. Remove and install new standing seam metal roof; including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts. 2. Install roof, valley, gutter, and downspout ice/snow melt system including electrical circuits. 3. Interior and exterior modifications including remove carpet and install carpet tiles, replace stained and damaged acoustical panels and ceiling tiles, and seal windows. Also, install new insulation in the areas where the ceiling is dropped. 4. Install additional communication outlets and electrical for telecom. 5. Install chain link fence, personnel gate, motorized gate, and associated electrical and safeties.
Historical details
- Status
- Closed
- Deadline
- August 11, 2026
- First captured
- July 9, 2026
- Publisher reference
- 82699a4041974ec4a2ab32452853c9e9
Eligibility: Total Small Business Set-Aside (FAR 19.5)
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.