Argon Piping Supply, Installation and Testing
ENERGY, DEPARTMENT OF
This opportunity closed July 27, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- Liquid Nitrogen at Point Mugu, CAOpenDEPT OF DEFENSENo deadline listed
- USAFA Liquid Nitrogen Plant/GeneratorOpenDEPT OF DEFENSENo deadline listed
- RFI: USAFA LIQUID NITROGEN PLANT/GENERATOROpenDEPT OF DEFENSENo deadline listed
- Solicitation - Bulk Dinitrogen Tetroxide (N2O4) AESP RequirementOpenDEPT OF DEFENSECloses in 3 days
- Direct Supply of Natural Gas-DLA Energy Natural Gas Program 7.1 Northeast Region SPE604-26-R-0403OpenDEPT OF DEFENSECloses tomorrow
About this archived opportunity
July 8, 2026 - Attachment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attachmed link. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.
Historical details
- Status
- Closed
- Deadline
- July 27, 2026
- First captured
- July 9, 2026
- Publisher reference
- bf37b159eab140d9bc6ba6b9d00e3949
Eligibility: No Set aside used. NONE
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.