Argon Piping Supply, Installation and Testing
ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.FERMILAB - DOE CONTRACTOR
Place of performance: Lead, SD
Free. One email, no account needed.
- Posted
- Jul 9, 2026
- Closes
- Jul 27, 2026 (in 18 days)
At a glance
This is a government contract opportunity posted by ENERGY, DEPARTMENT OF in the industrial building construction category. The deadline is July 27, 2026, 19 days from now. Work is performed in Lead, SD.
Classification and identifiers
- Industry (NAICS)
- Industrial Building Construction (236210)
- Product or service (PSC)
- Construction of Miscellaneous Buildings (Y1JZ)
- Solicitation number
- 73573
Who can apply
No Set aside used. NONE
About this opportunity
July 8, 2026 - Attachment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attachmed link. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW define...