FY 2025 GTIB Resurfacing Project Phase 1
Iron City, Town Of
Free. One email, no account needed.
- Posted
- Jul 9, 2026
- Closes
- Jul 14, 2026 (in 5 days)
About this opportunity
Sealed Bids for the construction of the FY 2025 GTIB Resurfacing Project Phase 1 will be received, by Town of Iron City, at the 115 N Church St, Iron City, GA 39859, until 11:00 AM, Tuesday, July 14, 2026, local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY 2025 GTIB Resurfacing Project Phase 1 as shown on the construction drawings. In general, construction consists of resurfacing approximately - 0.4 miles of roadway and all associated measures for the complete project. Time allotted for completion of work is 30 consecutive calendar days to subst...