Open·Synced from source July 9, 2026
IFB 26-016 Ferndale Phase III Underground Power
Fairburn, City Of
View solicitation at Fairburn, City Of
Free. One email, no account needed.
- Posted
- Jul 9, 2026
- Closes
- Jul 22, 2026 (in 13 days)
Who can apply
There will be 2� HDPE-SDR 13.5 innerduct with tape required for all primary wire on the project
About this opportunity
This project consists of the installation of 1/0 underground primary wire on a 12470/7200V system in a loop feed. There will be 2� HDPE-SDR 13.5 innerduct with tape required for all primary wire on the project. The primary cable will consist of a 25 KV rating as well as all corresponding rubber goods required in all pad mount transformers and terminating cabinets. All secondary wire required will also be in conduit with the above specifications and size as denoted on the drawings.
Finding similar opportunities...