Osborne Park Re-Development_Phase 3 Improvements
Euharlee, City Of
Free. One email, no account needed.
- Posted
- Jul 9, 2026
- Closes
- Aug 6, 2026 (in 28 days)
Who can apply
The compact scope above is intended for advertisement purposes only; the full scope, technical requirements, dimensions, materials, and incidental work are described in the Drawings, Specifications, and other Contract Documents…
About this opportunity
PROJECT SUMMARY The Work generally consists of redevelopment improvements at Osborne Park including selective removal and earthwork; construction of new gravel pedestrian trails with ADA-related grading features; timber edging, retaining elements, exercise stations, drainage improvements, rain gardens, an infiltration basin, storm drainage structures, streambank restoration, trail lighting, landscaping, a fishing pier, and a prefabricated boardwalk with gangway, floating dock, and kayak launch. An additional prefabricated floating dock, with a kayak launch proposed as a separately bid additive alternate and is contingent on permitting approval. The compact scope above is intended for advertisement purposes only; the full scope, technical requirements, dimensions, materials, and incidental ...
Related opportunities
- P.S. 143 - QUEENS - PHASE 3- 'PLAYGROUND REDEVELOPMENT FOR JOP'NYC School Construction Authority (SCA)Up to $4.0M
- Design-Build Rehab of the Southgate Rec. Area (DeSINTERIOR, DEPARTMENT OF THECloses in 15 days
- Juniper Springs BoardwalkAGRICULTURE, DEPARTMENT OFCloses in 32 days
- Repair Community Recreation Bldg. 45DEPT OF DEFENSECloses in 7 days
- Repair Community Recreation Bldg. 45DEPT OF DEFENSECloses in 7 days
- Repair Community Recreation Bldg. 45DEPT OF DEFENSECloses in 7 days