PNA-484-07022026CMGC
Transportation-2, Department Of
Free. One email, no account needed.
- Posted
- Jul 9, 2026
- Closes
- Sep 4, 2026 (in 57 days)
Who can apply
Georgia DOT is seeking to contract with a Construction Manager/General Contractor to provide preconstruction and construction services for the replacement of the US 19/SR 9 Bridge over CSX Railroad #639817J along its existing alignment to meet current design standards, while spanning the existing CSX tracks and the Atlanta Beltline trail and accommodating a proposed future track expansion beneath the structure in Fulton County, Georgia (the Project)…
About this opportunity
Georgia DOT is seeking to contract with a Construction Manager/General Contractor to provide preconstruction and construction services for the replacement of the US 19/SR 9 Bridge over CSX Railroad #639817J along its existing alignment to meet current design standards, while spanning the existing CSX tracks and the Atlanta Beltline trail and accommodating a proposed future track expansion beneath the structure in Fulton County, Georgia (the Project). This Project will be awarded to a Construction Manager/General Contractor utilizing a One-Phase Best Value method. See the PNA for additional details.
Related opportunities
- A76_2026_SGR - BRIDGE REPLACMENT OVER N.F. CLINCH RIVERVirginia Department of TransportationCloses in 13 days
- Replace Inner Gate at East GateGeorgiaCloses today
- Project TN ERFO FS CHRKE804 2020-2(1) - Cherokee National ForestTRANSPORTATION, DEPARTMENT OFCloses today
- W912HN26RA012 (LPTA) Project No: 90737- Repair Barracks Building 399 (Section D); Fort Benning, GADEPT OF DEFENSECloses tomorrow