B926 Replace Security Forces Elevator
DEPT OF DEFENSE
Place of performance: Columbus, MS
Free. One email, no account needed.
- Posted
- Jul 11, 2026
- Closes
- Aug 17, 2026 (in 37 days)
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the commercial and institutional building construction category. The deadline is August 17, 2026, 38 days from now. Work is performed in Columbus, MS. This solicitation carries a Total Small Business Set-Aside (FAR 19.5) set-aside.
Classification and identifiers
- Industry (NAICS)
- Commercial and Institutional Building Construction (236220)
- Product or service (PSC)
- Repair or Alteration of Office Buildings (Z2AA)
- Solicitation number
- FA302226R0018
- Contracting office
- FA3022 14 CONS LGCA
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Total Small Business Set-Aside (FAR 19.5)
About this opportunity
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically. Description: The primary objective of this project is to replace the elevator car, mechanical pump and control systems, and hoist-way doors. The intent is to reuse existing hydraulic jack system in the elevator shaft. Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 28 Jul 2026 at 9:00 AM CST. Atten...
Related opportunities
- Repair B632, Fire Suppression and Hangar DoorDEPT OF DEFENSECloses in 12 days
- 183 CES Repair Base Fire Alarm SystemDEPT OF DEFENSE
- Control Systems Replacement Facility 255, Vance AFBDEPT OF DEFENSECloses in 2 days
- Repair Building 3002 Fuel Cell HangarDEPT OF DEFENSE
- B522 HVAC, B414 DEMODEPT OF DEFENSECloses in 19 days
- Demo of Modular BuildingDEPT OF DEFENSECloses in 3 days