USS RUSHMORE (LSD-47) WATER CONTROL VALVE A/C PLANT CONDENSER; REPLACE
DEPT OF DEFENSE
Place of performance: Sasebo, Japan
Free. One email, no account needed.
- Posted
- Jul 11, 2026
- Closes
- Aug 4, 2026 (in 24 days)
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the ship building and repairing category. The deadline is August 4, 2026, 24 days from now. Work is performed in Sasebo, Japan.
Classification and identifiers
- Industry (NAICS)
- Ship Building and Repairing (336611)
- Product or service (PSC)
- Non-Nuclear Ship Repair (west) Ship Repair (including Overhauls and Conversions) Performed On. Non-Nuclear Propelled and Nonpropelled Ships West of the 108th Meridian (J999)
- Solicitation number
- N6264926Q0447
- Contracting office
- NAVSUP FLT LOG CTR YOKOSUKA
Who can apply
About this opportunity
NAVSUP Fleet Logistics Center Yokosuka (FLCY) Site Sasebo issues a competitive solicitation for the USS RUSHMORE (LSD-47) for the following job requirement. WATER CONTROL VALVE FOR NO.4 A/C PLANT CONDENSER; REPLACE WATER CONTROL VALVE FOR NO.3 A/C PLANT CONDENSER; REPLACE NO.3 A/C PLANT REF RIGERATION SYSTEM; TEST AND REPAIR POP: from 10/12/2026 to 3/1/2026 (CCD 7/31/2027). Place of Performance: Commander, Fleet Activities Sasebo (CFAS) in Japan. The NAVSUP Fleet Logistics Center (FLC) Yokosuka Site SASEBO issues a competitive solicitation to Master Ship Repair Agreement (MSRA) and capable Agreement for Boat Repair (ABR) holders in "Japan only". Please ensure that your company meets these criteria and provides any necessary documentation to demonstrate your authorization to perform this wo...
Related opportunities
- USS RUSHMORE(LSD-47) WATER CONTROL VALVE;REPLACEDEPT OF DEFENSECloses in 13 days
- USS RUSHMORE (LSD-47): BALLAST TANK 6-67-0-W; INSPECT AND REPAIRDEPT OF DEFENSECloses in 16 days
- USS RUSHMORE (LSD-47) VOID REPAIR AND OTHERSDEPT OF DEFENSECloses in 13 days
- USS RUSHMORE (LSD-47) 7C1 VEHICLE LASHING SOCKET IN WELL DECK; REPLACEDEPT OF DEFENSECloses in 13 days
- LSD 47, 8PK, CHT TANK 5-31-2-W; REPAIRDEPT OF DEFENSECloses in 10 days
- LSD-47, 4PK NONSKID DECK COVERING AND DECK PLATE AT 06 LEVEL WEATHER DECK; REPLACEDEPT OF DEFENSECloses in 10 days