North East River Maintenance Dredging, Cecil County, MD
DEPT OF DEFENSE
This opportunity closed August 13, 2026. 3 similar opportunities are open right now.
Similar opportunities open now
- Industry Day - Delaware Bayshore, Beneficial Use of Dredged MaterialSame funderOpenDEPT OF DEFENSENo deadline listed
- RICHMOND INNER HARBOR FY26 MAINTENANCE DREDGING PROJECTSame funderOpenDEPT OF DEFENSECloses today
- Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MDSame funderOpenDEPT OF DEFENSECloses in 4 days
About this archived opportunity
The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.This invitation for bid has five (5) attachments.
Historical details
- Status
- Closed
- Deadline
- August 13, 2026
- First captured
- July 14, 2026
- Publisher reference
- fc33bddc47cf4d65878da22ab4025982
Eligibility: Total Small Business Set-Aside (FAR 19.5)
Free. One email, sent if this program reopens or Funding Landscape first discovers a close match that is currently open. We watch for 12 months, then stop. No list.