LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
DEPT OF DEFENSE
- Posted
- Jul 15, 2026
- Closes
- Nov 16, 2026 (in 79 days)
Similar opportunities open now
- Dam Safety Production Center - Huntington (DSPC-H) Industry DaySame funderOpenDEPT OF DEFENSENo deadline listed
- 3389 Large Class Hopper Dredge (LCHD-ESS)Same funderOpenDEPT OF DEFENSECloses Mar 2027
- Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025Same funderOpenDEPT OF DEFENSECloses Jun 2028
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the other heavy and civil engineering construction category. The deadline is November 16, 2026, 80 days from now.
Classification and identifiers
- Industry (NAICS)
- Other Heavy and Civil Engineering Construction (237990)
- Product or service (PSC)
- Construction of Other Non-Building Facilities (Y1PZ)
- Solicitation number
- W912P926RA004
- Contracting office
- W07V ENDIST ST LOUIS
Who can apply
About this opportunity
NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------...