AK-KENAI NWR-UTV
INTERIOR, DEPARTMENT OF THE
This opportunity closed July 20, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- Utility Terrain Vehicles (UTV) RequirementOpenDEPT OF DEFENSENo deadline listed
- 5-Seat Utility Task Vehicles (UTV) .OpenDEPT OF DEFENSENo deadline listed
- 2026 Toyota Land cruiser 250 VX (Brand Name or Equal)OpenSTATE, DEPARTMENT OFCloses in 2 days
- VEHICLE MAINTENANCE (VM) 15K 4 POST LIFT WITH INSTALLATIONOpenDEPT OF DEFENSECloses in 7 days
- CDDAR - Crashed, Damaged, or Disabled Aircraft Recovery TrailersOpenDEPT OF DEFENSECloses in 47 days
About this archived opportunity
QTY 1 2026 Can-Am Defender Pro Limited Single Cab QTY 1 2026 Can-Am Defender Max XT Cab - Minimum 80 horsepower - Minimum cargo box capacity of 700 pounds - Minimum payload capacity of 1030 pounds - Minimum towing capacity of 2500 pounds - Minimum seating capacity of 3 personnel (single cab)/6 personnel (dual cab) - 4-cycle gas engine (must be liquid cooled) (EFI) - Minimum fuel tank capacity of 10 gallons - Electronic drive belt protection - Continuously Variable Transmission (CVT) with clutch enclosure - Auto-locking front differential - CVT engine-braking - Fully independent front and rear suspension - Hydraulic disc brakes (front and rear) - Power steering - Four-wheel drive (switch activated on the dash) - Ground clearance must be greater than 12 inches Required Accessories/Packages - Radial tires with aggressive tread - LED headlights/taillights - Hydraulic power lift for cargo box - Cab, doors, roof, windshield (fully pressurized cab) - HVAC - Front brush guard - Heavy-duty skid plate - Factory installed winch with remote - 2-inch hitch receiver Evaluation Factors Factor 1 Technical Acceptability (Pass/Fail) The Government will evaluate the offeror's quote to verify compliance with all requirements in the solicitation and requirements document. Pass: Quote meets all mandatory requirements. Fail: Quote does not meet one or more mandatory requirements. Factor 2 Past Performance (Pass/Fail) Past performance will be evaluated to determine acceptability only. The Government will review past performance information from CPARS, PPIRS, and other sources. Acceptable: Offeror demonstrates satisfactory performance on similar contracts and has no terminations for cause or default within the past three (3) years. Unacceptable: Offeror has a record of unsatisfactory performance or one or more terminations for cause or default within the past three (3) years. Factor 3 Price Price will be evaluated for reasonableness. Award will be made to the lowest-priced offeror whose quote is technically acceptable and whose past performance is acceptable
Historical details
- Status
- Closed
- Deadline
- July 20, 2026
- First captured
- July 15, 2026
- Publisher reference
- 87f32fa5901c47ecae0b4c90a54e0bae
Free. One email, sent if this program reopens or Funding Landscape first discovers a close match that is currently open. We watch for 12 months, then stop. No list.