Battery Energy Storage System (BESS) Relocation
DEPT OF DEFENSE
Place of performance: Newburgh, NY
Free. Verify your email, then we send one reminder only.
- Posted
- Jul 18, 2026
- Closes
- Aug 6, 2026 (in 19 days)
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the freight transportation arrangement category. The deadline is August 6, 2026, 20 days from now. Work is performed in Newburgh, NY. This solicitation carries a Total Small Business Set-Aside (FAR 19.5) set-aside.
Classification and identifiers
- Industry (NAICS)
- Freight Transportation Arrangement (488510)
- Product or service (PSC)
- Other Cargo and Freight Services (V119)
- Solicitation number
- W50S8D26QA015
- Contracting office
- W7NR USPFO ACTIVITY NYANG 105
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Total Small Business Set-Aside (FAR 19.5)
About this opportunity
There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement. Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible ...