27-008 FY26 LMIG Resurfacing Project
Sandy Springs, City Of
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 7, 2026
- Closes
- Sep 9, 2026 (in 31 days)
- Last verified
- Aug 9, 2026
Similar opportunities open now
- 2026-0011 LMIGOpenStockbridge, City OfCloses in 2 days
- Resurfacing Contract 2026 LMIG LRA Countywide ThoroughfaresOpenGeorgiaCloses in 4 days
- Soperton 2026 LMIG/LRAOpenSoperton, City OfCloses in 25 days
- Eastman 2025 LMIG/LRAOpenEastman, City OfCloses in 16 days
- T32-D1-PavePres-SR 115 and SR 52 Roundabout-Lumpkin-190242OpenTransportation, Department OfCloses in 16 days
About this opportunity
The City of Sandy Springs is soliciting sealed bids for the work consisting of milling and resurfacing approximately 22.35 miles of roadway throughout the City, including milling to a minimum depth of one and one-half (1.5) inches, patching (12.5 mm or 19 mm) where required, and paving with 12.5 mm asphalt at 165 lbs./SY, or as directed by the Engineer/City of Sandy Springs representative. The roadway segments are identified in the Contract Documents. The City reserves the right to add or delete roadway segments during the contract term. Traffic control and mobilization costs will be adjusted for areas that are added or removed from the scope of the contract. Award shall be made to the lowest responsive and responsible bidder meeting all minimum technical requirements. | Entity: Sandy Spri...
Related opportunities
- 2026-0011 LMIGStockbridge, City OfCloses in 2 days
- Resurfacing Contract 2026 LMIG LRA Countywide ThoroughfaresGeorgiaCloses in 4 days
- Soperton 2026 LMIG/LRASoperton, City OfCloses in 25 days
- Eastman 2025 LMIG/LRAEastman, City OfCloses in 16 days
- T32-D1-PavePres-SR 115 and SR 52 Roundabout-Lumpkin-190242Transportation, Department OfCloses in 16 days
- T32-D1-PavePres-SR 77 SPUR-Hart-190256Transportation, Department OfCloses in 16 days